0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: EST+SDM AL0 3005
Status: completed

Project Type

Function / usage: High-speed rail bridge
Material: Prestressed concrete bridge
Structure: main bridge:
Rigid frame bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaducts:
Multiple T-section girder bridge

Location

Location: , , ,
Part of:
Coordinates: 44° 55' 54.52" N    0° 29' 11.74" W
Show coordinates on a map

Technical Information

Dimensions

approach viaduct 1
total length 135 m
deck width 6.960 m
number of spans 6
approach viaduct 2
total length 202.5 m
deck width 6.960 m
number of spans 9
main bridge
total length 114 m
crossing angle 63°

Materials

piers reinforced concrete
abutments reinforced concrete
walls reinforced concrete
girders precast prestressed concrete

Participants

Conceding authority
Concessionaire
Design
Architecture
Checking engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Giannopoulos, Alexandros / Yazbeck, Nabil / El Hajjami, Mohammed / Le Tallec, Marine / Martin, Kevin (2015): Sauts de mouton de la LGV SEA. In: Travaux, n. 912 (January 2015), pp. 50-55.
  • About this
    data sheet
  • Structure-ID
    20072617
  • Published on:
    24/02/2017
  • Last updated on:
    27/01/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine