General Information
Official designation: | EST+SDM AL0 3005 |
---|---|
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
main bridge: Rigid frame bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaducts: Multiple T-section girder bridge |
Location
Location: |
Ambares-et-Lagrave, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Part of: | |
Coordinates: | 44° 55' 54.52" N 0° 29' 11.74" W |
Technical Information
Dimensions
approach viaduct 1 | ||
---|---|---|
total length | 135 m | |
deck width | 6.960 m | |
number of spans | 6 | |
approach viaduct 2 | ||
total length | 202.5 m | |
deck width | 6.960 m | |
number of spans | 9 | |
main bridge | ||
total length | 114 m | |
crossing angle | 63° |
Materials
piers |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
walls |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Conceding authority
Concessionaire
Design
-
egis jmi
- Nabil Yazbeck (designer)
Architecture
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Sauts de mouton de la LGV SEA. In: Travaux, n. 912 (January 2015), pp. 50-55. (2015):