General Information
Completion: | October 2015 |
---|---|
Status: | in use |
Project Type
Structure: |
U-shaped girder bridge |
---|---|
Material: |
Fiber-reinforced concrete bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Haunched girder bridge |
Function / usage: |
Experimental / prototype bridge |
Location
Location: |
Ebingen, Albstadt, Zollernalbkreis, Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 12' 51.13" N 9° 1' 43.05" E |
Technical Information
Dimensions
total length | 15.55 m | |
span | 15.00 m | |
weight | 14 t | |
deck slab thickness | 0.09 m | |
girder depth | 0.55 - 1.17 m | |
web thickness | 0.07 m | |
total width | 2.94 m | |
walkway width | 2.80 m |
Materials
deck |
carbon-fiber reinforced concrete
|
---|
Participants
Owner
Structural engineering
-
Knippers Helbig GmbH
- Thorsten Helbig (structural engineer)
- Roman Schieber (structural engineer)
General contractor
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): Extremely Light and Slender Precast Pedestrian-Bridge Made out of Carbon-Concrete. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- Fuß- und Radwegbrücke aus Carbonbeton in Albstadt-Ebingen - Die weltweit erste ausschließlich carbonfaserbewehrte Betonbrücke. In: Beton- und Stahlbetonbau, v. 111, n. 10 (October 2016), pp. 676-685. (2016):
- About this
data sheet - Structure-ID
20072270 - Published on:
07/12/2016 - Last updated on:
04/01/2017