General Information
Status: | in use |
---|
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Aiton, Savoie (73), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 45° 33' 19.59" N 6° 15' 16.48" E |
Technical Information
Dimensions
embankment | 125 000 m³ | |
deck | deck depth | 2.30 m |
deck width | 2 x 9.80 m | |
downstream bridge | ||
---|---|---|
total length | 295 m | |
span lengths | 42 m - 4 x 52 m - 45 m | |
number of spans | 6 | |
upstream bridge | ||
total length | 260 m | |
span lengths | 35 m - 3 x 52 m - 37 m - 32 m | |
number of spans | 6 |
Quantities
sheet piling | S3: 2 600 m² | |
enrockment | 10 000 m³ | |
retaining walls in Reinforced Earth | 1 800 m² | |
deck | structural steel | 1 000 t |
concrete volume | 1 530 m³ | |
substructure | concrete volume | 2 525 m³ |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Client
Architecture
- Bogumil Serafin (architect)
Construction engineers
Civil works
Steel construction
Subcontractor
Earthworks
Concrete supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A43 Maurienne: Aiton, le viaduc du départ. In: Travaux, n. 708 (April 1995), pp. 68-75. (1995):