General Information
Completion: | 1994 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Drilling and blasting |
Location
Location: |
Versam, Grisons, Switzerland Tenna, Grisons, Switzerland |
---|---|
Coordinates: | 46° 45' 41.65" N 9° 21' 10.90" E |
Coordinates: | 46° 46' 11.33" N 9° 21' 1.07" E |
Technical Information
Dimensions
tunnel length | 1 712 m | |
total excavated section | 63 m² | |
number of tubes | 1 |
Quantities
excavated material | 107 856 m³ |
Participants
Owner
Client
Structural engineering
Geotechnical/geological experts
Co-contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20043724 - Published on:
21/02/2009 - Last updated on:
10/11/2017