0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: October 1915
Completion: 1916
Duration of works: 9 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Spree River
Coordinates: 52° 29' 10.92" N    13° 28' 50.23" E
Show coordinates on a map

Technical Information

Dimensions

arch span 76 m

Cost

cost of construction Mark 105 000

Materials

arch reinforced concrete

Participants

Design
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010299
  • Published on:
    19/09/2003
  • Last updated on:
    13/08/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine