General Information
Completion: | 2010 |
---|---|
Status: | in use |
Project Type
Structure: |
Stressed ribbon bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Location
Location: |
Rupperswil, Argovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 24' 52" N 8° 8' 46" E |
Technical Information
Dimensions
width | 1.1 m | |
sag | 1.2 m | |
total length | 103 m | |
sag:span | 1/62 | |
span lengths | 15.2 m - 74.05 m - 13.2 m | |
number of spans | 3 |
Cost
construction cost (without tax) | Swiss Franc 1 000 000 | |
cost of construction per m² | Swiss Franc 8 832 |
Materials
deck |
steel
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A comparison of three different systems of stress ribbon bridges. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062066 - Published on:
10/10/2011 - Last updated on:
05/02/2016