0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1904
Status: demolished (1995)

Project Type

Location

Location: , ,
Carried:
  • Bundesstrasse B 8
Crossed:
  • Ruhr River
Replaced by: Aakerfährbrücke (1997)

Technical Information

Dimensions

span lengths 25.65 m - 51.60 m - 75.00 m - 51.60 m - 21.60 m - 20.00 m - 2 x 21.20 m - 20.30 m - 27.20 m
number of spans 10

Materials

arches steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20009137
  • Published on:
    21/04/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine