General Information
Other name(s): | A86 Ouest - Tunnel Ouest |
---|---|
Status: | project phase |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Rueil-Malmaison, Hauts-de-Seine (92), Ile-de-France, France Bailly, Yvelines (78), Ile-de-France, France |
---|---|
For: |
|
Part of: |
Technical Information
Dimensions
tunnel length | 7.5 km | |
depth | 20 - 90 m |
Design Loads
design speed | 70 km/h |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Le regain d'un métier historique de Sogea Construction (tunnel du Lioran, tunnel du Bois-de-Peu, le TIMA, A86 Ouest). In: Travaux, n. 822 (September 2005), pp. 96-103. (2005):
- Stationäres Brandschutzsystem für das Tunnelprojekt im Pariser Autobahnring A86. In: Felsbau, v. 25, n. 1 ( 2007), pp. 65.
- Synthèse des critères de calcul des niches de sécurité et de ventilation du tunnel DUPLEX A86. Presented at: AFTES - Journées techniques, Monaco, 2008, pp. 357-368. (2008):
- Un tube double étage pour boucler la boucle. In: Construction moderne ( 2006), pp. 30-33. (2006):
- Tunnel A86 à l'ouest. Cofiroute dévoile sa stratégie de protection contre l'incendie. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5355 (14 July 2006), pp. 16. (2006):
- About this
data sheet - Structure-ID
20007949 - Published on:
31/01/2003 - Last updated on:
28/05/2021