0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 14
Beginning of works: September 1998
Completion: July 1999
Duration of works: 9 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A20
Crosses:
  • Autobahn A19
Part of:
Coordinates: 54° 1' 41.26" N    12° 12' 0.91" E
Show coordinates on a map

Technical Information

Dimensions

total length 66.5 m
span lengths 2 x 32 m
number of spans 2
bridge surface 3 256 m²
total width 52.34 m
deck deck depth 1.6 m
deck 1 width 11.40 m
deck 2 width 14.71 m
deck 3 width 14.71 m
deck 4 width 11.40 m

Cost

cost of construction German Mark 7 900 000
cost of construction per m² German Mark 2 430.00

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders precast prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20017973
  • Published on:
    06/10/2005
  • Last updated on:
    10/10/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine