General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Two-span continuous girder bridge Double T-section girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wöbbelin, Amt Ludwigslust-Land, Ludwigslust-Parchim, Mecklenburg-Western Pomerania, Germany |
---|---|
Crosses: |
A 24 Motorway (Germany)
|
Carries: |
A 14 Motorway (Germany)
|
Coordinates: | 53° 25' 25.29" N 11° 31' 15.09" E |
Technical Information
Dimensions
total length | 72 m | |
span lengths | 2 x 36 m | |
number of spans | 2 | |
deck | deck width | 51.60 m |
bridge surface | 3 715.20 m² | |
girder depth | 1.75 m | |
number of lanes | 4 x 2 | |
roadway / carriageway width | 8.00 m + 10.50 m + 10.50 m + 8.00 m |
Quantities
deck | concrete volume | 3 710 m³ |
prestressing steel | 115 t | |
reinforcing steel | 435 t | |
substructure | concrete volume | 7 514 m³ |
reinforcing steel | 527 t |
Design Loads
live load | Lastmodell LMM 1 | |
design code(s) | DIN FB 101 |
Cost
cost of construction | Euro 9 400 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Design consultants
Structural engineering
Soil investigation report
Checking engineering
- Burkhard Sigeneger (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2016. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2016, pp. 47-59.
- Chronik des Brückenbaus. In: (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310. (2016):
- About this
data sheet - Structure-ID
20072781 - Published on:
29/03/2017 - Last updated on:
29/03/2017