0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Silniční estakáda II. přes trať ČD - přivaděč D1 Severní spoj
Beginning of works: 2006
Completion: 2009
Status: in use

Project Type

Location

Location: , ,
Address: I/47 and D1 approach road
Crosses:
  • Oder/Odra River
Coordinates: 49° 49' 55.93" N    18° 13' 40.88" E
Show coordinates on a map

Technical Information

Dimensions

total length 353 m
span lengths 39 m - 45 m - 2 x 51.5 m - 4 x 45 m - 31 m
number of spans 9

Quantities

structural steel 1 980 t

Materials

piers reinforced concrete
deck slab prestressed concrete
abutments reinforced concrete
girders steel

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20036955
  • Published on:
    30/04/2008
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine