0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1 July 1908
Status: demolished (2017)

Project Type

Location

Location: , ,
Address: 12 Street SE
Crosses:
  • Bow River
Replaced by: Zoo Bridge (2017)
Coordinates: 51° 2' 36.92" N    114° 1' 55.27" W
Show coordinates on a map

Technical Information

Dimensions

number of lanes 2
abutments number 2

Materials

truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20089880
  • Published on:
    06/12/2024
  • Last updated on:
    06/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine