0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

11 de Noviembre Trail Bridge

General Information

Beginning of works: 10 October 2016
Completion: 2016
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Rio 11 de Noviembre river.
Coordinates: 16° 54' 58.93" S    65° 36' 13.26" W
Show coordinates on a map

Technical Information

Dimensions

span 50 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring timber

Notes

The bridge built by Bridges to Prosperity serves around 47 people.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084888
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine