0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

100th Anniversary of Poland's Independence Bridge

General Information

Name in local language: Most 100-lecia Odzyskania Niepodległości Polski
Beginning of works: 16 January 2017
Completion: 10 November 2018
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Vistula River
Coordinates: 54° 20' 33.98" N    18° 49' 29.99" E
Show coordinates on a map

Technical Information

Dimensions

main span 59.5 m
width 14.9 m
total length 181.5 m

Cost

cost of construction Polish Zloty 59 000 000

Participants

Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20083025
  • Published on:
    04/06/2022
  • Last updated on:
    04/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine