EDGE Südkreuz
In this project, Blumer Lehmann was responsible for the planning and implementation of the wood cladding for the four tree-like steel columns, which are a special eye-catcher in the atrium and connect the landings at airy heights via free-floating stairs. The two structures were built using an elemental wood hybrid construction method based on the CREE Buildings System.
|
More media of this structureMore media for this product/service available at: |