0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

I-90 Innerbelt Bridge - Controlled Demolition, Inc.

Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Implosion Subcontractor to Main Demolition Contractor, Joseph B. Fay Company of Tarentum, Pennsylvania) performs the successful explosives felling of six (6), structural steel spans (totaling 1,550' long) of the I-90 Innerbelt Bridge in Cleveland, Ohio at 6:00 AM on Saturday, July 12, 2014. The explosives sequence required the precision felling of the spans which passed adjacent to a mainline Norfolk Southern Railroad trestle, above a CSX railroad spur and two (2) active city streets (with live underground gas, electric and fiber optics cables), and within 11' of third party properties to remain.

Media-ID: 369150
Created in/on: 14 July 2014
Author/Source:
YouTube
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Last updated on: 11/01/2022

More media of this structure

USA (1959)