BridgingMzamba buildCollective NPO, CUAS, bridgingMzamba CSC Mbizana, Eastern Cape
A community driven project, bridgingMzamba, addressed the urgent need for a safe crossing of the Mzamba River. The end result, a 140 Meter long suspension bridge, came about through an intensive collective approach between users, students and experts. The collaboration lead to the production of knowledge, cultural exchange and skills development. Design and technology was guided by the reduction of environmental impact, available resources and a remote construction site. Production Credits: Breinstorm Brand Architects, Annalet Steenkamp productions, The Kinetic.
|
More media of this structure |