0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

BridgingMzamba buildCollective NPO, CUAS, bridgingMzamba CSC Mbizana, Eastern Cape

A community driven project, bridgingMzamba, addressed the urgent need for a safe crossing of the Mzamba River. The end result, a 140 Meter long suspension bridge, came about through an intensive collective approach between users, students and experts. The collaboration lead to the production of knowledge, cultural exchange and skills development. Design and technology was guided by the reduction of environmental impact, available resources and a remote construction site. Production Credits: Breinstorm Brand Architects, Annalet Steenkamp productions, The Kinetic.

Media-ID: 369018
Créé(s) en/le: 17 novembre 2016
Auteur/Source:
YouTube
Note légale / conditions d'utilisation:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Modifié(e) le: 11.01.2022

D'autres médias pour cet ouvrage

Afrique du Sud (2015)