Scaffolding solution for the renovation of Hohenzollern Castle for proper historic preservation
Integrated access technology in the metric PERI UP system grid: 1.25 m wide stair flights and seamless connection to the working levels ensure a safe working environment.
|
More media for this product/service available at: |