0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Replacement of expansion joints at the Praterbrücke in Vienna

Lifting into position of the second pair of center supports in front of the “wall” of the opened MMBS elements. Less than 10 minutes later, traffic was flowing again on one lane.

Media-ID: 337751
Medium provided by: MAURER SE , image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 12/02/2020

More media for this product/service available at: