Media File No. 284059
In the Residential Tower, empty ducts had been installed first. The strand tendons were later threaded into the ducts when construction progress had reached level 32.
|
More media for this product/service available at: |
In the Residential Tower, empty ducts had been installed first. The strand tendons were later threaded into the ducts when construction progress had reached level 32.
|
More media for this product/service available at: |