0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Early striking with the drophead system reduced on-site material requirements of the slab formwork.

Early striking with the drophead system reduced on-site material requirements of the slab formwork.

Media-ID: 269487
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 10/12/2016

More media for this product/service available at: