Tunnelling and Underground Space Technology - v. 4, n. 3 (January 1989)
Published: | January 1989 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Grandori, Carlo | Development and current experiences with double-shield TBMs in Italy | 333-336 |
Interview with Thomas D. O'Rourke | 257-259 | |
Lemperiere, F. / Broto, A. / Gravost, P. / de Maublanc, I. | LASER—A miracle solution to Paris traffic, or just a gadget? | 261-278 |
Van Lohuizen, H. P. S. | A new pre-metro line for Amsterdam? | 285-291 |
Recommendations for the treatment of water inflows and outflows in operated underground structures | 343-407 | |
Abdel Salam, Mohamed El Hosseiny | Regional line of the Cairo metro | 279-283 |
Van Assche, R. / De Smedt-Jans, H. | Road works, hydraulic works, and subway works for place Sainctelette, Brussels (Belgium) | 293-321 |
Speers, C. R. | The role of the engineer in controlling the excavation phase at the iSangoyana Rail tunnel | 323-332 |
Fenn, O. | The use of water jets to assist free-rolling cutters in the excavation of hard rock | 409-417 |