The role of the engineer in controlling the excavation phase at the iSangoyana Rail tunnel
Author(s): |
C. R. Speers
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, January 1989, n. 3, v. 4 |
Page(s): | 323-332 |
DOI: | 10.1016/0886-7798(89)90081-3 |
- About this
data sheet - Reference-ID
10111050 - Published on:
07/12/2018 - Last updated on:
30/12/2018