The Structural Engineer - v. 95, n. 1 (January 2017)
Published: | January 2017 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Train, Norman | Business Practice Note No. 1: Clarity in fee proposals | 22-23 |
Taylor, Penny | Do you know enough about company finance and strategy? | 28-29 |
Jones, Kell / Martin, Bruce / Winslow, Pete | Innovation in structural engineering – the art of the possible | 14-21 |
Crossman, Alan | President's end-of-year report | 6-7 |
Soane, Alastair | Temporary Works Toolkit. Part 5: Temporary works failures – what are the common causes? | 24-26 |
Pallett, Peter | Temporary Works Toolkit. Part 6: Backpropping of flat slabs – design issues and worked examples | 30-32 |
Knight, David / Mitchell, Owen | Viewpoint: Engineer 2050 – a day in the life | 34-35 |
White, Joe | Viewpoint: Is seismic design knowledge relevant to UK engineers? | 36-37 |