0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Business Practice Note No. 1: Clarity in fee proposals

Author(s):
Medium: journal article
Language(s): English
Published in: The Structural Engineer, , n. 1, v. 95
Page(s): 22-23
DOI: 10.56330/vcil2446
Abstract:

In the first note in this series, Norman Train stresses the importance of making clear from the outset what an engineer will – and will not – do in return for their fee.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.56330/vcil2446.
  • About this
    data sheet
  • Reference-ID
    10763059
  • Published on:
    23/03/2024
  • Last updated on:
    23/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine