Journal of Civil Engineering and Management - v. 23, n. 7 (July 2017)
Published: | July 2017 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Shariati, Shahram / Abedi, Masoumeh / Saedi, Alieh / Yazdani-Chamzini, Abdolreza / Tamošaitienė, Jolanta / Šaparauskas, Jonas / Stupak, Stanislav | Critical Factors of the Application of Nanotechnology in Construction Industry By Using Anp Technique Under Fuzzy Intuitionistic Environment | 914-925 |
Muller, Marina Figueiredo / Garbers, Amanda / Esmanioto, Filipe / Huber, Natan / Loures, Eduardo Rocha / Canciglieri Junior, Osiris | Data Interoperability Assessment Though Ifc for BIM in Structural Design – A Five-year Gap Analysis | 943-954 |
Chen, Chien-Jung / Juan, Yi-Kai / Hsu, Yin-Hao | Developing A Systematic Approach To Evaluate and Predict Building Service Life | 890-901 |
Aznar, Beltrán / Pellicer, Eugenio / Davis, Steven / Ballesteros-Pérez, Pablo | Factors Affecting Contractor’s Bidding Success for International Infrastructure Projects in Australia | 880-889 |
Serpell, Alfredo / Ferrada, Ximena / Rubio, Norma Larissa | Fostering the Effective Usage of Risk Management in Construction | 858-867 |
Polat, Gul / Eray, Ekin / Neval Bingol, Befrin | An Integrated Fuzzy Mcgdm Approach for Supplier Selection Problem | 926-942 |
Wang, Jian / Ng, Pui-Lam / Wang, Weishan / Du, Jinsheng / Song, Jianyong | Modelling Chloride Diffusion in Concrete With Influence of Concrete Stress State | 955-965 |
Glišović, Ivan / Pavlović, Marko / Stevanović, Boško / Todorović, Marija | Numerical Analysis of Glulam Beams Reinforced With Cfrp Plates | 868-879 |
Chiu, Betty W. Y. / Lai, Joseph H. K. | Project Delay: Key Electrical Construction Factors in Hong Kong | 847-857 |
Kala, Zdenek / Valeš, Jan / Jönsson, Jeppe | Random Fields of Initial Out of Straightness Leading To Column Buckling | 902-913 |
Bazrafshan Moghadam, Bahador / Farhad Mollashahi, Hamid | Suggesting A Simple Design Method for Cold Recycled Asphalt Mixes With Asphalt Emulsion | 966-976 |