Project Delay: Key Electrical Construction Factors in Hong Kong

Author(s):

Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 7, v. 23
Page(s): 847-857
DOI: 10.3846/13923730.2017.1319410
Abstract:

The price of construction project delays is too substantial to pay. Electrical construction is a critical activity influ­encing project completion, but research on its delay factors was limited. Aimed at contributing knowledge to this niche area, a study was conducted in Hong Kong. 56 delay factors, in 10 groups, were found with electrical construction. Processing the data of a survey on 64 consultants and 68 contractors revealed “insufficient labour”, “late decision making of client” and “insuf­ficient electrical contractor” as the top delay factors. Strong agreements on the importance rankings of the delay factors existed between the consultant and contractor groups, and the principal factor components were “incompetent project team members”, “lack of skillful labour” and “poor on-site planning”. Besides discussing the common problems underlying the delay factors, recommendations were made for avoiding the problems. An understanding of the delay factors would help construction stake­holders in taking proactive measures to prevent project delay. The approach of the study can serve as reference for similar, future research in construction management.

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2017.1319410.
  • About this
    data sheet
  • Reference-ID
    10354261
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine