0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Why were 800 m of the Boßler Tunnel built twice? - TBM passing a shotcrete section

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.201600074.
  • About this
    data sheet
  • Reference-ID
    10084047
  • Published on:
    09/10/2018
  • Last updated on:
    18/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine