0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Jörg Rainer Müller

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Goldberger, Harald / Esslinger, Christoph / Lützerath, Thomas / Müller, Jörg Rainer / Galli, Mario (2017): Why were 800 m of the Boßler Tunnel built twice? - TBM passing a shotcrete section. In: Geomechanics and Tunnelling, v. 10, n. 2 (April 2017).

    https://doi.org/10.1002/geot.201600074

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine