0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Whole Risk Assessment System and Management System of Urban Road Tunnel Operation Stage

Author(s): (Capital Univ. of Economics and Business, Beijing 100070, China; China Communications Construction Co., Ltd., Beijing 100082, China (corresponding author).)
(Capital Univ. of Economics and Business, Beijing 100070, China.)
(CCCC Highway Consultants Co., Ltd., Beijing 100082, China.)
(CCCC Highway Consultants Co., Ltd., Beijing 100082, China.)
Medium: journal article
Language(s): English
Published in: Journal of Highway and Transportation Research and Development (English Edition), , n. 1, v. 14
Page(s): 94-101
DOI: 10.1061/jhtrcq.0000721
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jhtrcq.0000721.
  • About this
    data sheet
  • Reference-ID
    10589535
  • Published on:
    08/03/2021
  • Last updated on:
    19/04/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine