Whole Risk Assessment System and Management System of Urban Road Tunnel Operation Stage
Auteur(s): |
Bing Zhou
(Capital Univ. of Economics and Business, Beijing 100070, China; China Communications Construction Co., Ltd., Beijing 100082, China (corresponding author).)
Chuan-Sheng Wang (Capital Univ. of Economics and Business, Beijing 100070, China.) Fang-liang Liu (CCCC Highway Consultants Co., Ltd., Beijing 100082, China.) Er-jue Wang (CCCC Highway Consultants Co., Ltd., Beijing 100082, China.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Highway and Transportation Research and Development (English Edition), mars 2020, n. 1, v. 14 |
Page(s): | 94-101 |
DOI: | 10.1061/jhtrcq.0000721 |
- Informations
sur cette fiche - Reference-ID
10589535 - Publié(e) le:
08.03.2021 - Modifié(e) le:
19.04.2023