0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Visualization of Delay Claim Analysis Using 4D Simulation

Author(s): (Scheduling Advisor, Hydro-Québec, 855 Sainte-Catherine St. East, Montréal, QC, Canada H2L 4P5; Ph.D. Student, Concordia Institute for Information Systems Engineering, Concordia Univ., 1515 Sainte-Catherine St. West, Montréal, QC, Canada H3G 2W1 (correspon)
(Professor, Concordia Institute for Information Systems Engineering, Concordia Univ., 1515 Sainte-Catherine St. West, Montréal, QC, Canada H3G 2W1.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 10
Page(s): 05018002
DOI: 10.1061/(asce)la.1943-4170.0000267
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000267.
  • About this
    data sheet
  • Reference-ID
    10579884
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine