- Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 4 (November 2021). (2021):
- Visualization of Delay Claim Analysis Using 4D Simulation. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (August 2018). (2018):
- Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (August 2020). (2020):