Utjecaj načina financiranja na troškovno-vremenske aspekte javnih i društvenih građevina

Impact of funding on cost-time aspects of public and social buildings

Author(s):


Medium: journal article
Language(s): English
Published in: Građevinar, , n. 1, v. 71
Page(s): 21-32
DOI: 10.14256/jce.2205.2017
Abstract:

The comparison of the traditional (budget-funded) public building procurement model with the public private partnership (non-budget funded) model is presented in the paper. Public service buildings procured based on the traditional model and those procured according to the PPP model are compared in the scope of research involving nine buildings realized in the Republic of Croatia. The results point to greater efficiency of the PPP model in the construction of public service buildings, with regard to both cost and time of construction work.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.14256/jce.2205.2017.
  • About this
    data sheet
  • Reference-ID
    10522670
  • Published on:
    09/12/2020
  • Last updated on:
    19/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine