0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Utjecaj načina financiranja na troškovno-vremenske aspekte javnih i društvenih građevina

Impact of funding on cost-time aspects of public and social buildings

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Građevinar, , n. 1, v. 71
Page(s): 21-32
DOI: 10.14256/jce.2205.2017
Abstrait:

The comparison of the traditional (budget-funded) public building procurement model with the public private partnership (non-budget funded) model is presented in the paper. Public service buildings procured based on the traditional model and those procured according to the PPP model are compared in the scope of research involving nine buildings realized in the Republic of Croatia. The results point to greater efficiency of the PPP model in the construction of public service buildings, with regard to both cost and time of construction work.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.14256/jce.2205.2017.
  • Informations
    sur cette fiche
  • Reference-ID
    10522670
  • Publié(e) le:
    09.12.2020
  • Modifié(e) le:
    19.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine