Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
Author(s): |
Nichole Boultbee
Oliver Robson Serge Moalli Rich Humphries |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, April 2018, n. 2, v. 4 |
Page(s): | 260-266 |
DOI: | 10.1016/j.eng.2017.09.003 |
- About this
data sheet - Reference-ID
10669148 - Published on:
12/06/2022 - Last updated on:
12/06/2022