Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia
Auteur(s): |
Nichole Boultbee
Oliver Robson Serge Moalli Rich Humphries |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, avril 2018, n. 2, v. 4 |
Page(s): | 260-266 |
DOI: | 10.1016/j.eng.2017.09.003 |
- Informations
sur cette fiche - Reference-ID
10669148 - Publié(e) le:
12.06.2022 - Modifié(e) le:
12.06.2022