Engineering - v. 4, n. 2 (avril 2018)
Publié: | avril 2018 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Merlini, Davide / Stocker, Daniele / Falanesca, Matteo / Schuerch, Roberto | The Ceneri Base Tunnel: Construction Experience with the Southern Portion of the Flat Railway Line Crossing the Swiss Alps | 235-248 |
Zhang, Haibo / Yang, Changyu | The Longest Railway Tunnel in China | 165-166 |
He, Weiguo / Liu, Peng | The Undersea Tunnel on Qingdao Metro Line 8 | 167-169 |
Boultbee, Nichole / Robson, Oliver / Moalli, Serge / Humphries, Rich | Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia | 260-266 |