Understanding Extension of Time under Different Standard Design-Build Forms of Contract
Author(s): |
Islam H. El-adaway
Ricky A. Vance (Operation District Supervisor, Tennessee Dept. of Transportation, 2665 NW Broad St., Murfreesboro, TN 37129; formerly, M.Sc. Student, Dept. of Civil and Environmental Engineering, Univ. of Tennessee, Knoxville, TN 37996.) Ibrahim S. Abotaleb (Postdoctoral Research Fellow, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 211-Butler-Carlton Engineering Hall, 1401 N. Pine St., Rolla, MO 65409.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, February 2020, n. 1, v. 12 |
Page(s): | 04519031 |
DOI: | 10.1061/(asce)la.1943-4170.0000331 |
- About this
data sheet - Reference-ID
10579992 - Published on:
08/03/2021 - Last updated on:
08/03/2021