Understanding Extension of Time under Different Standard Design-Build Forms of Contract
Auteur(s): |
Islam H. El-adaway
Ricky A. Vance (Operation District Supervisor, Tennessee Dept. of Transportation, 2665 NW Broad St., Murfreesboro, TN 37129; formerly, M.Sc. Student, Dept. of Civil and Environmental Engineering, Univ. of Tennessee, Knoxville, TN 37996.) Ibrahim S. Abotaleb (Postdoctoral Research Fellow, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 211-Butler-Carlton Engineering Hall, 1401 N. Pine St., Rolla, MO 65409.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, février 2020, n. 1, v. 12 |
Page(s): | 04519031 |
DOI: | 10.1061/(asce)la.1943-4170.0000331 |
- Informations
sur cette fiche - Reference-ID
10579992 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021