A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
Author(s): |
Amir Hossein Hosseinian
Vahid Baradaran |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, August 2021, n. 1, v. 30 |
Page(s): | 321-363 |
DOI: | 10.1108/ecam-07-2019-0384 |
- About this
data sheet - Reference-ID
10631734 - Published on:
01/10/2021 - Last updated on:
21/04/2023