A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
Auteur(s): |
Amir Hossein Hosseinian
Vahid Baradaran |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, août 2021, n. 1, v. 30 |
Page(s): | 321-363 |
DOI: | 10.1108/ecam-07-2019-0384 |
- Informations
sur cette fiche - Reference-ID
10631734 - Publié(e) le:
01.10.2021 - Modifié(e) le:
21.04.2023