Torre Sacyr Vallehermoso. Ejecución de la estructura
Author(s): |
Ramón Sánchez Fernández
Francisco Javier Rodríguez Ortiz |
---|---|
Medium: | journal article |
Language(s): | English, Spanish |
Published in: | Hormigón y acero, 3rd Quarter 2008, n. 249, v. 59 |
Page(s): | 153-169 |
Abstract: |
Torre Sacyr-Vallehermoso. Execution of structureConstruction of a high-rise building is always a challenge, moreover in Spain where previous examples are not common. These tall buildings are located at small plots but consist of huge foundation mats, highly stressed vertical structures leading to non conventional solutions and a very great floor surface up in height. It is mandatory a careful design of the elevation systems together with logistics to best help the site works. The paper below describes the construction of SyV Tower, remarking the site organization, construction cycle and erection of singular elements, all of which has made possible the completion of the structure (from foundations to roof) in the 26 months scheduled. |
Keywords: |
high-rise buildings climbing formwork tower cranes perimeter protection hoists composite supports central core HA-70 thermocouples prefabricated rebars
|
Available from: |
![]() |