0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Torre Sacyr Vallehermoso. Ejecución de la estructura

Auteur(s):

Médium: article de revue
Langue(s): anglais, espagnol
Publié dans: Hormigón y acero, , n. 249, v. 59
Page(s): 153-169
Abstrait:

Torre Sacyr-Vallehermoso. Execution of structure

Construction of a high-rise building is always a challenge, moreover in Spain where previous examples are not common. These tall buildings are located at small plots but consist of huge foundation mats, highly stressed vertical structures leading to non conventional solutions and a very great floor surface up in height. It is mandatory a careful design of the elevation systems together with logistics to best help the site works. The paper below describes the construction of SyV Tower, remarking the site organization, construction cycle and erection of singular elements, all of which has made possible the completion of the structure (from foundations to roof) in the 26 months scheduled.

Mots-clé:
bâtiments hauts Coffrage grimpant noyau central
Disponible chez: ACHE - Asociación Española de Ingeniería Estructural

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10075617
  • Publié(e) le:
    13.06.2018
  • Modifié(e) le:
    13.06.2018
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine