Time for concrete casting: a new paradigm

Author(s):


Medium: journal article
Language(s): English
Published in: Revista IBRACON de Estruturas e Materiais, , n. 6, v. 5
Page(s): 798-811
DOI: 10.1590/s1983-41952012000600005
Abstract:

The Brazilian standard NBR 7212 states that the time of transporting the concrete between the start of mixing should be less than 90 minutes so that by the end of the discharge is a maximum of 150 minutes. Yet often, in construction, concrete is used after this period. In order to investigate the behavior of concrete after setting time of cement was cast six concrete mixtures with two types of cement. The mixtures were produced and kept fresh for six hours, adopting a procedure for maintenance of abatement by superplasticizer and agitation. The results show that of the test piece molded over six hours of maintained or increased the compressive strength average.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1590/s1983-41952012000600005.
  • About this
    data sheet
  • Reference-ID
    10413567
  • Published on:
    12/02/2020
  • Last updated on:
    12/02/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine