0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Revista IBRACON de Estruturas e Materiais, , n. 6, v. 5
Seite(n): 798-811
DOI: 10.1590/s1983-41952012000600005
Abstrakt:

The Brazilian standard NBR 7212 states that the time of transporting the concrete between the start of mixing should be less than 90 minutes so that by the end of the discharge is a maximum of 150 minutes. Yet often, in construction, concrete is used after this period. In order to investigate the behavior of concrete after setting time of cement was cast six concrete mixtures with two types of cement. The mixtures were produced and kept fresh for six hours, adopting a procedure for maintenance of abatement by superplasticizer and agitation. The results show that of the test piece molded over six hours of maintained or increased the compressive strength average.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1590/s1983-41952012000600005.
  • Über diese
    Datenseite
  • Reference-ID
    10413567
  • Veröffentlicht am:
    12.02.2020
  • Geändert am:
    12.02.2020
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine