0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time-dependent analysis during construction of concrete tube for tower high-rise building

Author(s):




Medium: journal article
Language(s): English
Published in: Structural Concrete, , n. 4, v. 13
Page(s): 236-247
DOI: 10.1002/suco.201200011
Abstract:

Vertical and differential deformations in super-high-rise buildings are extremely important during construction. In order to be able to adjust the construction process accurately, taking the deformations into account, such deformations must be calculated exactly. The analysis of the vertical deformations of the high-rise Shanghai World Financial Centre building is illustrated in this paper. The prediction models of CEB-FIP 90 are used for calculating shrinkage and creep. The fictitious degree of hydration method has been applied for calculating the creep behaviour of the early-age concrete. The influence of steel bars on the vertical deformations has been analysed based on the macroscopical modulus method. Calculation of the vertical deformations includes the pre-construction and the post-construction deformations. Finally, the differential deformation between the concrete and the mega-structure column is determined. Theoretical results for the vertical displacement of this super-high-rise building agree very well with field monitoring data.

Keywords:
high-rise building time-dependent vertical deformation
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/suco.201200011.
  • About this
    data sheet
  • Reference-ID
    10067655
  • Published on:
    29/03/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine