0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Time-dependent analysis during construction of concrete tube for tower high-rise building

Autor(en):




Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Concrete, , n. 4, v. 13
Seite(n): 236-247
DOI: 10.1002/suco.201200011
Abstrakt:

Vertical and differential deformations in super-high-rise buildings are extremely important during construction. In order to be able to adjust the construction process accurately, taking the deformations into account, such deformations must be calculated exactly. The analysis of the vertical deformations of the high-rise Shanghai World Financial Centre building is illustrated in this paper. The prediction models of CEB-FIP 90 are used for calculating shrinkage and creep. The fictitious degree of hydration method has been applied for calculating the creep behaviour of the early-age concrete. The influence of steel bars on the vertical deformations has been analysed based on the macroscopical modulus method. Calculation of the vertical deformations includes the pre-construction and the post-construction deformations. Finally, the differential deformation between the concrete and the mega-structure column is determined. Theoretical results for the vertical displacement of this super-high-rise building agree very well with field monitoring data.

Stichwörter:
Hochhaus
Verfügbar bei: Siehe Verlag
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/suco.201200011.
  • Über diese
    Datenseite
  • Reference-ID
    10067655
  • Veröffentlicht am:
    29.03.2013
  • Geändert am:
    13.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine