Temperature Control for Mass Concrete Construction of Wentang Bridge 5# Pier Pile Cap in Winter Construction
Author(s): |
ZY Sun
JJ Zhou DM Wang J. Zhang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Physics: Conference Series, 1 April 2023, n. 1, v. 2476 |
Page(s): | 012079 |
DOI: | 10.1088/1742-6596/2476/1/012079 |
Abstract: |
In order to ensure the construction quality of mass concrete structures in winter, and avoid and prevent harmful temperature cracks of mass concrete, a calculation method of temperature field of hydration heat in winter based on finite element method is proposed in this paper. First, the three-dimensional finite element model of the temperature field of hydration heat is established; Then, the temperature variation of winter hydration heat temperature field of Wentang Bridge is calculated through experiments. The results show that the maximum measured temperature of the core point is 44.2 °C, and the corresponding calculated temperature is 53.7 °C. The maximum internal and external temperature difference measured is 24.7 °C, and the corresponding calculated temperature is 22.4°C. The research results prove that the calculation model can better simulate the concrete hydration process. |
- About this
data sheet - Reference-ID
10777587 - Published on:
12/05/2024 - Last updated on:
12/05/2024